VTA TRACK AND SIGNAL REHABILITATION

Project Description

RSE provided engineering and construction support services for the track and signal rehabilitation of the VTA’s downtown transit mall.

 

Scope of Services

The engineering work included trackwork, special trackwork, grade crossings, signals, and communications with trackwork and signaling upgrades as two major components for the rehabilitation.

RSE was the primary engineering consultant on this project for the preparation of the complete set of construction documents including plans, construction cost estimates, and specifications (PS&E). Trackwork design included site plans, track alignment and profile, typical track sections, track demolition, track construction details, track wire and signal circuit replacements, and special trackwork. Engineering support included technical specifications, construction cost estimates, schedule, and structural calculations for track slab reinforcements.

The project consisted of replacing embedded track, reconstructing roadways, reconstructing special trackwork, upgrading signal systems, and installing new signal and power.

The key features for signal-related work included replacing existing vital and non-vital relay logic with solid state VHLC microprocessor controller, installing new Hanning & Kahl HCS-V bi-directional TWC communication equipment, installing solid state GE HSC switch controllers, installing new signal heads with 8 3/8” LED aspects, preparing VHLC vital and non-vital application software programs, and providing control from the signal locations to the Operations Control Center (OCC).

CLIENT
Santa Clara Valley Transportation Authority (VTA)
LOCATION
San Jose, California
PROJECT HIGHLIGHTS
SERVICES
Engineering
Asset Management
Construction Modeling

KEY PROJECT ACTIVITIES INCLUDE:

  • Review of contractor submittals for compliance with contract specifications

  • Liaison between contractor and VTA operations for installation and testing of work

  • Inspection of signal equipment installation work to support VTA inspection forces

  • Witnessing of contractor testing for contract and safety compliance

  • Preparation of rail activation plans for VTA operations and light rail training personnel

  • Preparation of signal system operation SOP’s for VTA light rail training department

  • Participation in rail activation and dynamic testing operations